Infrastructure

I

Area of land  allotted (in acres)

Whether land transferred in the Name of Samiti

Vidyalaya shifted to permanent buildings on

 

: 30 Acres

: Yes on 10.03.2003:

01.07.2004

ii

Status of Boundary Wall

a.  Brick Wall
b.  Barbed wire fencing

 

 

Completed
Completed
But needs to be heightened

iii

Permanent buildings constructed

 

CPWD Pattern

iv

School building

 

Completed

v

Dormitories

:  Boys - 03 Nos.
   with Warden Residence – 04 Nos.

 

 

:  Girls - 01 Nos.
   with Warden Residence - 02 Nos.

vi

Kitchen/dining Hall

No. of shifts required for all students  to take food

 

:  Completed

2 Shifts

vii

Principal Residence

 

: 01 No.

viii

Staff Quarters

 

 

: Type III = 01 Nos.
  Type II = 08 Nos.
  Type I = 06 Nos.
  SP Sheds converted into Staff Qrs.:  No.

ix

M.P. Hall

Not available

x

Workshop

 

Not available

xi

Type of O.H. Tank

Its capacity

Present Status

:  Column based

:  10000 litres

: Water lickage

xii

U.G. tank

Its capacity

Present Status

 

:  10000 liters

: Working satisfactory

xiii

D.G. Set

 

 

:  Available
: Kirloskar make
:  15 KVA
: Working
: Year of procurement – 24.08.2005

xiv

Sewage Pump

: Not Available

xv

Water Pump

 

: 3000 liters  capacity

xvi

Electrification

Electric connection
Sub Station building
Street lighting

Numbers of hrs. during day when power supply is available on an average.

 

Done
 :  Rural Feeder
:  Complete
: 49 Nos. of Poles

: 11 hrs.
  

xvii

Playfields

400 metre track
40 x 30 metre basket ball court
40 x 30 metre volley ball court
 

 

: Available
:  02 Nos.   – Available
: 02 Nos.   – Available

xviii

Water supply
Tube Well
Hand pump
Connection from PHED

 

 

: Potable, 01 Nos.-  working
: 04 Nos.-  working (Floride zone)
: 06 hours supply in a day

xix

Rajiv Gandhi Smriti Van

:  Available

xx

Fire fighting arrangement

:  Available in working condition.

xxi

Ccleaning of

  1. Septic tank
  2. Water tanks

 

: Every year before one week of reopenind of the school after summer vacation.
: Every year.

xxii

Whether area around transformer is fenced

:  Yes 

xxiii

Whether open wells, if any, are covered from top

: No
No open wells existing

xxiv

Works taken up under M&R fund during current year and last year:-

: White washing of hostels, painting of hostels & buildings, purchase of Electrical & plumbing Items, cleaning of Septic tanks, water tanks, Electrical & plumbing works. Replacement of broken glasses, pipe fittings etc. Maintenance of the Campus. Repairing & replacing of aluminum seeds in doors & almiras.

Year

Name of work  (M&R)

Expenditure
(Rs. In lacs)

Cumulative expenditure during the year

2006 -07

As mentioned above.

Rs. 2.92 Lakhs

Rs. 2.92 Lakhs

 

2007-08

As mentioned above.

Rs. 1.54 Lakhs

Rs. 1.54 Lakhs

  2008-09 As mentioned above. Rs. 2.99 Lakhs Rs. 2.99 Lakhs
  2009-10 As mentioned above. Rs. 2.97 Lakhs Rs. 2.97 Lakhs